← All Guides

Vinyl siding can be installed in cold weather, but the crew has to allow for how the panels move as temperatures change. The Polymeric Exterior Products Association (PEPA) says to leave extra clearance at openings and stops below 40 degrees Fahrenheit. Ask each bidder how they handle cold-weather installation before you compare totals.

Is it okay to install siding in winter?

Yes. PEPA, formerly the Vinyl Siding Institute, publishes an installation manual and installer tips with rules for installing below 40 degrees Fahrenheit, including larger clearances at openings and slower cutting in cold weather. Rules written for cold weather tell the crew how to work in it, so ask each bidder whether they follow them.

A bid should show the crew knows them. Two siding bids with the same product and the same total can differ in how the panels are nailed and where gaps are left, and those details are hard to see once the job is finished. This guide covers only what cold weather adds to a siding bid. Our guide to siding bid comparison covers the rest of the line items.

Why does cold weather change how siding is nailed?

Because vinyl moves with temperature. PEPA says vinyl siding contracts and expands as the outside temperature changes, and that it can expand and contract 1/2 inch or more over a 12 foot 6 inch length during normal, year-round temperature changes. Its manual says tight nailing, screwing or stapling will cause the siding to buckle with changes in temperature.

That is why the installer's nailing matters. PEPA says not to drive the nail head tightly against the siding's nailing hem, to leave about 1/32 inch of clearance, roughly the thickness of a dime, and to center fasteners in the slots so the panel can move. Ask the crew how they leave room for panels installed in the cold to expand when it warms up.

How much space should siding have at windows and trim in cold weather?

More than in warm weather. PEPA says that when installing in temperatures below 40 degrees Fahrenheit, the minimum clearance at openings and stops should be increased to 3/8 inch. That clearance gives the panel room to expand rather than push against a window casing or a trim piece.

You do not need to measure this yourself. You can ask each contractor whether the crew changes its clearances when the temperature is below 40 degrees, and what manufacturer's instructions they follow for the siding named in the bid. A confident answer, in writing, is a better sign than a bid that says only "installed per manufacturer."

Does cold weather affect cutting and handling vinyl siding?

Cutting, yes. PEPA says to cut slowly, especially in cold weather, when using a circular saw, and its manual recommends a reversed fine-tooth blade for a cleaner cut. The manual adds that in extremely cold weather the saw should move through the material slowly to prevent chipping or cracking. Ask the contractor how the crew handles panels in the cold.

PEPA also advises not to face nail or staple through the siding, except for one nail needed to finish at the top of a gable. Nails belong in the nailing hem, through the slots. If you see nails through the face of the panels during the job, ask the crew about it that day.

What about caulk and sealant around siding in winter?

Sealants have their own temperature limits. Tremco, a sealant maker, says caulking should optimally be applied between 40 and 80 degrees Fahrenheit, and advises clearing dew, ice, frost or water from a surface and letting it dry before sealing. It also notes that low temperatures slow the cure of most caulks.

That is a commercial sealant maker's general guidance, so check the label of the product in your bid. Ask each bidder which sealant they plan to use around windows, doors and trim, and what they do if the surface is frosty or damp. Our guide to siding replacement cost factors explains where sealant and trim show up in a bid.

What if the siding is not vinyl?

Then the product's own instructions apply, and the cold-weather rules may differ. This guide is based on PEPA's vinyl siding guidance and does not cover fiber cement, wood or other claddings. Ask the contractor to name the manufacturer's installation instructions for the product in the bid and what those instructions say about cold weather.

If the bid covers more than one material or trade, our guide on one contractor or separate bids helps you see where the work meets. Whatever the product, the same habit applies: get the manufacturer's instruction and the cold-weather plan into the written proposal.

What to look for A bid that helps you compare A bid that leaves you guessing
Product and instructions Names the siding and the installation instructions the crew follows "Siding installed per code"
Nailing Says nails go in the nailing hem, centered in the slots, not driven tight Silent on nailing
Clearance at openings Says the crew increases clearance in cold weather No mention of temperature
Cutting Says how panels are cut in the cold Silent on cutting
Sealant Names the product and says what the crew does with frost or moisture "Caulk included"
Other materials Names the instructions for each material One line for all cladding

What to ask every siding contractor about winter installation

Put the same questions to every bidder and keep the answers in writing so you can set them side by side. Several of these follow what PEPA and Tremco describe: nailing, clearance, cutting and sealant in the cold. Ask about the exact siding product named in the bid.

Copy this list into a note and send it to each contractor before you compare totals.

  • Which siding product is in the bid, and which installation instructions will the crew follow?
  • Do the instructions for that product say anything about cold weather?
  • How will the panels be nailed, and will the nails be centered in the slots and left loose enough to move?
  • Will you change clearances at windows, doors and trim when it is below 40 degrees?
  • How will the crew cut the panels in the cold?
  • Which sealant goes around openings, and what is its temperature range?
  • What will the crew do if a surface is frosty or damp when they arrive?
  • Who decides whether the weather is acceptable on the day, and what happens to the schedule?
  • Will you put the cold-weather plan in the written proposal?

Where Otter Quotes fits

We create a written scope of work for your project and send it to multiple contractors, who compete with bids on that same scope. You compare the bids online, next to reviews and licensing information, and sign online, without a salesperson in your home. Contractors do not see your name, phone number or street address until you choose one. Contractors pay Otter Quotes a fee on the accepted bid. We are not a contractor, we do not sell upgrades and we do not work with your insurance company.

Related guides: siding bid comparison, siding replacement cost factors, one contractor or separate bids, roof replacement in cold weather.

Frequently asked questions

Can you install vinyl siding in the winter?

Yes, with care. PEPA, formerly the Vinyl Siding Institute, says to increase clearance at openings and stops to 3/8 inch when installing below 40 degrees Fahrenheit, and to cut slowly in cold weather. Ask each bidder how the crew handles cold-weather installation, and ask them to put the plan in the bid.

Why does vinyl siding need room to move?

PEPA says vinyl siding contracts and expands as the temperature changes, by 1/2 inch or more over a 12 foot 6 inch length, and that tight nailing will cause it to buckle. It advises centered fasteners in the slots and a nail head left about 1/32 inch from the panel. Ask how the crew nails.

Does cold weather change how siding is cut?

PEPA says to cut slowly in cold weather when using a circular saw, and its manual recommends a reversed fine-tooth blade for a smoother, cleaner cut. The manual also says to move the saw slowly in extremely cold weather to prevent chipping or cracking. Ask the contractor how the crew cuts and handles panels in the cold.

Is caulk affected by cold weather?

Yes. Tremco, a sealant maker, says caulking is optimally applied between 40 and 80 degrees Fahrenheit, that surfaces should be free of dew, ice, frost and water, and that low temperatures slow the cure. Check the label of the product in your bid and ask what the crew does with a frosty surface.

Do these rules apply to fiber cement or wood siding?

Not necessarily. This guide draws on PEPA's vinyl siding guidance. Other products have their own manufacturer instructions with their own cold-weather rules. Ask each contractor to name the instructions for the product in the bid and what they say about temperature, and have the answer written into the proposal.